CENTER ELECTRIAL TESTING 03/01/2016 Location: B84A Bach Dang Str., Tan Binh Dis., HCMC, Vietnam Client: EVN HCMC Project area: 9,599.8 m2 Construction area: 4,372.19 m2 Total construction area: 11,140.42 m2 (1 Basement + 8 storeys) Building density factor: 45.74% Year: 2016 1 of 4